Start
Existing cash
Project a savings balance from a starting deposit, monthly contributions, an annual savings rate and a fixed number of years.
Separate the cash you deposit from the interest assumption so the real driver of growth remains clear.
Enter your figures, then press “Project the savings balance” to calculate your result.
The calculator applies one-twelfth of the entered annual rate each month and then adds the monthly contribution. It separates the ending balance into the starting amount, new deposits and modeled interest.
Showing both parts prevents a rate assumption from hiding an unaffordable savings pace.
Existing cash
New cash
Modeled growth
For short and medium saving periods, the amount deposited often drives more of the result than a small rate difference. The output keeps contributions visible so interest is not mistaken for the main source of progress.
Compare a zero-rate case with the entered rate. The gap shows exactly how much of the projection depends on credited interest rather than household cash flow.
A higher advertised return may come with withdrawal limits, conditions, market risk or a rate that can change. Money needed on a fixed date requires access and capital protection appropriate to that purpose.
Verify deposit protection, eligibility, balance tiers and early-withdrawal conditions from current official documents. This calculator models arithmetic only and does not compare products.
A constant rate keeps the calculation understandable, but actual savings rates can move. Recalculate after a material rate change, withdrawal or contribution adjustment.
Record the account, target, calculation date and assumed rate together. That makes the next review explainable and prevents a previous projection from being treated as a guaranteed maturity value.
No. It holds the entered rate constant to explain the arithmetic. Actual rates, balance tiers, conditions and credited interest can change.
The separation reveals how much progress comes from household contributions and how much depends on the rate assumption, which makes the projection easier to stress-test.